No.
|
Mutu
Beton
|
SLUMP
|
Harga
Beton Cor Ready Mix/ M3
|
|
1
|
K-B0
|
12 ± 2cm
|
Rp. 720.000,-
|
|
2
|
K-125
|
12 ± 2cm
|
Rp. 730.000,-
|
|
3
|
K-150
|
12 ± 2cm
|
Rp. 750.000,-
|
|
4
|
K-175
|
12 ± 2cm
|
Rp. 770.000,-
|
|
5
|
K-200
|
12 ± 2cm
|
Rp. 790.000,-
|
|
6
|
K-225
|
12 ± 2cm
|
Rp. 820.000,-
|
|
7
|
K-250
|
12 ± 2cm
|
Rp. 840.000,-
|
|
8
|
K-275
|
12 ± 2cm
|
Rp. 860.000,-
|
|
9
|
K-300
|
12 ± 2cm
|
Rp. 880.000,-
|
|
10
|
K-325
|
12 ± 2cm
|
Rp. 900.000,-
|
|
11
|
K-350
|
12 ± 2cm
|
Rp. 920.000,-
|
|
12
|
K-375
|
12 ± 2cm
|
Rp. 940.000,-
|
|
13
|
K-400
|
12 ± 2cm
|
Rp. 960.000,-
|
|
14
|
K-425
|
12 ± 2cm
|
Rp. 980.000,-
|
|
15
|
K-450
|
12 ± 2cm
|
Rp. 1.000.000,-
|
|
16
|
K-475
|
12 ± 2cm
|
Rp. 1.010.000,-
|
|
17
|
K-500
|
12 ± 2cm
|
Rp. 1.050.000,-
|
|
* Harga sewaktu-waktu
dapat berubah
|
K475 Rp.1.010.000,-, K500 Rp.1.050.000,-
- Konfirmasi pemesanan dilakukan minimal 2 s/d 3 hari Sebelum pengecoran
- Ketersediaan jalan yg layak (dapat dilalui truck mixer)dan kordinas lapangan(keamanan dan masyarakat), sepenuhnya menjadi tanggung jawab pihak pemesan(pembeli)
- Bila ada penambahan additive ditanggung oleh pembeli
- Harga tidak menetap dan sewaktu-waktu dapat berubah apabila ada kenaikan bbm, material dan kebijakan pemerintah.
- Teknis pembayaran dilakukan sebelum Jadwal pengecoran berlangsung minimal 2 hari sebelum pengecoran. Harap konfirmasi pelunasan secepatnya.
- Pembayaran dianggap sah apabila pembayaran dilakukan sesuai dengan prosedur cara pemesanan
Kami mohon data pemesan :
- Nama Pemesan/ Perusahaan/ Kontraktor.
- Alamat proyek pengecoran.
- Mutu Concrete Ready Mix.
- Estimasi kebutuhan ready mix (M3).
- Jenis Concrete pump yang di butuhkan.
- Vibrator dan Trowel.
Tidak ada komentar: